Blog

Notes from the shop floor

Practical guidance on manufacturing processes, materials and working with Lab Ready on orthopedic parts.

Quality & Compliance

How to Specify a Thread Callout Before You Send an RFQ

A thread callout with only a nominal size leaves out class of fit, engagement length and internal-vs-external. Here is what a complete one states.

Read more →
Quality & Compliance

What Inspection Deliverables to Request on a Medical Device Parts RFQ

An RFQ that only says "inspection required" gets the same report on every feature. Here's how to decide which deliverable a critical feature actually needs.

Read more →
Quality & Compliance

Prototype to Production: What Changes on the Drawing and RFQ

A prototype and a production order for the same part aren't specified the same way. Here's what changes in tolerance, material and the RFQ when a machined design moves from one stage to the other.

Read more →
Quality & Compliance

How to Evaluate an Orthopedic Contract Manufacturer

Picking a manufacturing partner for orthopedic parts is a supplier-qualification decision, not just a quote comparison. Here is what to ask before sending the RFQ.

Read more →
Quality & Compliance

One-Off vs. Small-Batch Medical Device Manufacturing: Choosing the Right Process

Quantity alone doesn't decide the manufacturing route. Here's how design stability, tooling cost and follow-on quantity separate one-off printing from batch production.

Read more →
Quality & Compliance

What to Include in an RFQ for Medical Device Machined and Molded Parts

The seven inputs that get a medical device machining, printing or molding RFQ quoted correctly the first time, without a round of clarifying questions.

Read more →
Quality & Compliance

Trial Fit and Assembly Checks Before You Sign Off a Medical Device Part

A part can pass its drawing and still not fit its mating component. Here's what an optional trial fit or assembly check confirms before shipment, and what it doesn't replace.

Read more →
Quality & Compliance

How to Read a Tolerance Callout Before You Send an RFQ

A tight tolerance callout does more than raise cost — it decides whether a feature is milled, ground, or cut by EDM. Here is how to read one before you send an RFQ.

Read more →
Quality & Compliance

ISO 13485 Explained: What It Means When You're Choosing a Prototype Manufacturer

"ISO 13485 certified" shows up on a lot of supplier websites. Here's what the certification actually covers, and why it matters for a prototype supplier, not just a production one.

Read more →

Have a part ready to quote?

No upload portal required — send the project details directly.

Contact Lab Ready