Select tooling for the current program stage
Bridge tooling supports validation and early quantities without requiring a full production-tool investment for every development run.
Move a validated plastic component toward repeatable production material, finish and assembly through bridge or production tooling.
Injection molding becomes appropriate when a device team needs production-representative resin, repeatable parts and quantities that justify tooling. Bridge tooling can support design validation and early demand while production tooling is prepared. Overmolding adds a second material to a rigid substrate for grip, comfort, sealing or multi-durometer function.
Process selection should follow the drawing, application, material, critical features and the condition in which the part needs to arrive.
Bridge tooling supports validation and early quantities without requiring a full production-tool investment for every development run.
Substrate and elastomer selection, bond strategy, wall thickness, shutoffs and mechanical retention all affect whether a multi-material part performs as intended.
Machined and printed iterations can be used to settle geometry and fit before the team commits to tooling and production-representative resin.
Use these pages to connect the process with the device category, material and next project decision.
Bridge tooling is intended to produce production-representative parts for validation or early demand before a long-life production tool is justified or ready.
The move makes sense when geometry is sufficiently stable and the program needs repeatable parts in a production-representative resin and quantity.
Medical device overmolding bonds or mechanically retains a second material on a rigid substrate to create a soft-touch grip, sealing feature, multi-durometer part or another combined function. Material compatibility, retention, geometry and tooling must be reviewed together.
Send the CAD, quantity, material, finish and target date for a process review and quote.
The seven things that affect price and lead time — so your first quote is your last.